With cold weather on the way, PMSK reminds you to take care of your equipment

Maintain a clean and tidy working environment, there is no water around the equipment and plant floor, and pay attention to ice slippage in cold areas to avoid operators from falling and getting hurt.

  • Equipment Precautions

When the temperature is lower than 0°C during the day and night, the following sequence should be followed for equipment start-up and operation: after turning on the power supply for 5 minutes, start the preheating of each mechanism or execute the preheating program for more than 5 minutes, so that the various parts of the equipment can be fully preheated before carrying out the regular operation.

Keep the temperature of the environment where the equipment is used above 5°C to avoid low temperature causing alarms or abnormal startup of components such as PLC, touch screen, all-in-one machine, industrial control machine, and so on.

Strictly control the moisture into the equipment, to ensure that the gas source drying, filtration system normal operation, to reduce the moisture into the equipment air circuit system, regular drainage treatment of the filter and tank drain valve, to avoid low temperature icing caused by cylinders, solenoid valves and other work abnormality (slow action or jamming).

  • Equipment Warming Tips

Plate heating

The plate is too cold will absorb heat to cool down, affecting the sealing strip and hot melt adhesive bonding; you can take the sealing strip heating, increase the temperature of the hot melt adhesive use and other measures, the winter can be appropriate to increase the amount of glue to ensure that the bonding is solid. At the same time, winter can also choose to open a little longer hot melt adhesive. 

PMSK Shop

Intelligent Drilling Production Line

Intelligent Drilling Production Line

1. Composition: six side drilling machine, positioning system, high-definition code reader, automatic conveying2. Automatic identify the processing information of panel QR code, and complete six-sided drilling and grooving.3, through the six-sided drilling machine, reduce the plate turnover, the whole line only needs two people.4, it can m…

Edge Banding Connection Line

Edge Banding Connection Line

1. The rotary edge sealing line is matched with the smooth roller line through the edge sealing machine.2. Finish two or four edges sealing at one time, saving labor by 80% and improving efficiency by 30%.3, improve the yield, the plate does not fall to the ground and the roller line flows smoothly, reducing the plate damage.4, compatible …

Nesting Cnc Production Line

Nesting Cnc Production Line

1. The central control system has the function of cutting optimization, which reduces plate waste and improves production efficiency.2. On-site patching, there is no need to re-do file import data because of patching, saving time.3, 8 hours processing capacity reached about 240 sheets, effectively promoting the same batch, the same order and…

Advanced Production Furniture Making Machine

Advanced Production Furniture Making Machine

High-end panel furniture production line can achieve a production capacity of about 150 panels in 8 hours, with more complete functions, high efficiency and high precision

About Us

Anti-freezing of vacuum pumps (water-cooled vacuum pumps)

1.Please replace the water inside the water tank with antifreeze (antifreeze for big trucks will do) when using the water ring vacuum pump.

2.The use of anti-freeze powder: If any customer chooses to use anti-freeze powder, please make sure to choose non-corrosive materials, please consult the merchant before purchasing, otherwise it will cause damage to the mechanical seals and other accessories in the pump.

3.The tank water level: The tank water level must be maintained in the tank in the position of the filter, diligent observation, such as below this position must be immediately replenished.

4.Air compressor gas tank: Air compressor gas tank before leaving work in a timely manner to drain the water, the machine air circuit deflation. In order to prevent the next day ice, affecting the machine air circuit gas volume.

5.Spindle water and gas: The end of the work, remove the automatic tool changer spindle, to avoid the spindle within the water and gas icing, jamming the knife handle.

  • Treatment Measures

1.Vacuum pump: First of all, use the heat source to melt the impeller partially (with a tool to gently flick the motor blade can be easily rotated) and then on the motor. If the motor turns without suction, check whether there are still icing problems in the circulating water circuit at the air inlet and exhaust port and do the heating treatment.

2.Gas path: In case of leakage at the aerated oil-water separator, please disconnect the gas source with a hair dryer at a distance of about 20 centimeters from the cup to do the heating process, about 3 to 5 minutes and then aerated test.

3.Tool changing spindle: After completing the work on duty, it is recommended to remove the tool. If the tool cannot be removed or installed, it should be removed. It is recommended to use an electric blanket or a tool without direct concentrated heat to heat the spindle if it cannot be removed. If installation is not possible, it is recommended to use a hair dryer to heat the axis (tool installation position).

pmsk-cnc-machine

PMSK Cnc Wood Machine


PMSK Shop

DA48-2128 Cnc Router with Drill

DA48-2128 Cnc Router with Drill

The DA48-2128-cnc router is equipped with a 9KW automatic tool change spindle + (5+4) 9 vertical drill packages. Multi-function drilling, a large number of hole processing can be completed quickly, With PMSK-pt2 side hole machine, the function of drilling and slotting on all sides of the plate can be completed.

EA48G New Cnc Router Machine

EA48G New Cnc Router Machine

Furniture Making Machine 1325 1530 2030 Melamine Mdf Atc Cnc Router Wood Panel Nesting Cnc Machine

PT6.5 Atc Cnc Boring Machine

PT6.5 Atc Cnc Boring Machine

Horizontal Six Sides Automatic Cabinet Cnc Boring Drilling Milling Machine For Wood Panel Furniture Machinery Woodworking

PE-668J Pre-milling Edge Bander

PE-668J Pre-milling Edge Bander

Edge Bander Machines Automatic Side Drilling Hole Furniture Edge Banding Machine with Pre Milling

About Us
Expand more!