Search the whole station

Furniture Production Line

  • Intelligent Drilling Production Line

    3006

    1. Composition: six side drilling machine, positioning system, high-definition code reader, automatic conveying2. Automatic identify the processing information of panel QR code, and complete six-sided drilling and grooving.3, through the six-s...

    View details
  • Edge Banding Connection Line

    3020

    1. The rotary edge sealing line is matched with the smooth roller line through the edge sealing machine.2. Finish two or four edges sealing at one time, saving labor by 80% and improving efficiency by 30%.3, improve the yield, the plate does n...

    View details
  • Nesting Cnc Production Line

    3012

    1. The central control system has the function of cutting optimization, which reduces plate waste and improves production efficiency.2. On-site patching, there is no need to re-do file import data because of patching, saving time.3, 8 hours pr...

    View details
  • Sell Well Furniture Making Machine

    2925

    The panel furniture making machines can be connected to each other. This solution can achieve an output of about 100 to 120 panels in 8 hours, with high cost performance and high output.

    View details
  • Mass Production Furniture Production Line

    2915

    It is suitable for furniture factories with high production volume, and most of them are engineering orders. The average output of batch panel furniture production line can reach about 300~500 panels in 8 hours.

    View details
  • New Arrivals Furniture Making Machine

    2913

    Only two workers are needed to complete the whole production line, including labeling, drilling, grooving, cutting, edge banding, etc. The output can reach 140 to 160 sheets in 8 hours.

    View details
Expand more!